proposed 8 week cycle for strentgh and mass.

lgi stano 200 @ 600 mg daily weeks 1 through 8
antaeus labs mechabol @ 75 mg daily weeks 3 through 8
antaeus labs trenazone @ 1.5 ml daily weels 3 through 8

an 8 weeker of stano, 2 weeks solo and then 6 stacked with trenazone and mecha. Fairly straight forward, moderate dosages, a little on the long side but not drastic. I'm allways interested to hear what yous guys think. any thoughts, modifications or caveats regarding this stack.