Got a job as a contractor. Hoping to do this for the next 5-7 years if the war last that long.
As ill have nothing to do except lift, ive hired and online coach, and am going to get to it.

Cycle will consist of: 12 weeks
week 1-12: 4-adiol 725mg ED
week 1-12: Fomestane 250mg ED for e-control but that added 4-hydroxy test aint half bad neever
Week 1-12: MK-677 25mg ED
week 1- 8: Rad-140 20mg ED dem prostate benefits look nice
week 1- 2: Sdrol 10mg ED
week 3- 4: Sdrol 15mg ED
week 6-12: 1-adiol 150mg ED


Then run some torem/Clomid/nolva for PCT

Idk how the system works yet, and I don't want to ruin a 6 figure job over some vials. So im going to the prohormones for now. Once I get a better feel for everything ill start working on a cycle with like a vial per care package until im good, and get the HCG as well. But for now. Im just risking it idgaf. Lot's of shit, but if Im shutting myself down, im making it worth it.

Les dodis bois